Abu Dhabi international airport

Project name   Abu Dhabi international Airport Midfield
Customer  Anel
End User  ADAC
Segment PMCS
Country  UAE
Duration 2014 - 2020

Scope :

Design,Supply,Engineering, configuration,programming and commissioning of SCADA & power Managmement System (PME) for Medium Voltage (MV) SWGR & Low Voltage (LV) SWGR inside the Airport.

Solution Description :

Two Control rooms each one have redundant servers & Two Workstations to Monitor & Control the following :

  • Qty (42) LV SWGR Panel Through QTy (39) DCONC Control panel
  • Qty (1500 ) Power Meter Installed inside LV & sub LV Panels
  • Qty  ( 930 ) Sub LV Panel  through Qty remote IO Panel
  • Qty (84) MV SWGR panel through Qty (84) MV RTU MICOM
  • Integration with exist Siemens SCADA & BMS System